LOCATION: Durham, NC
DURATION: 10.10 – 04.11
TONNAGE: 2,600
FABRICATOR: Steel Fab VA
GC/CM: Whiting-Turner
OWNER: Durham County
PROJECT NOTES:
• Very limited jobsite with little area for steel laydown
• Complicated connections and interaction with precast wall panels
• Several full-penetration column splice welds and welded diagonal
bracing