LOCATION: Charleston, SC
DURATION: 04.10 – 09.10
TONNAGE: >18,000
FABRICATOR: CMC South Carolina Steel
GC/CM: BE&K/Turner (Joint Venture)
OWNER: Boeing Commercial Airlines
PROJECT NOTES:
• This facility will boost production of the 787 Dreamliner.
• 1 working day to set & stabilize 1.3 million pounds of steel joist
• Used over 450,000 structural bolts to connect steel members